portfolio_page-template-default,single,single-portfolio_page,postid-1427,bridge-core-3.0.1,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-28.8,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-6.9.0,vc_responsive
 

F10148 – Mordialloc SPS Air Treatment Facility

Mordialloc SPS Air Treatment Facility

Client

Melbourne Water

Location

Sewer Pumping Station, Corner Bear & Chute Streets, Mordialloc

Key Sector

Sewer

Contract Type

Design & Construction

Duration

12 months

Key Facts

  • The new ATF extracts and treats foul air from the SPS, treating the odour.
  • A new precast building was constructed within which the ATF is housed.
  • The ATF features bio-trickling filter followed by activated carbon filter which remove 90% of odours.
  • The ATF is capable of uninterrupted, automatic operation 24/7 throughout the year.

Background

The sewer pumping station (SPS) shares a boundary with two neighbouring properties who noticed odours from the station which gas testing confirmed. Melbourne Water remedied this issue by installing a new Air Treatment Facility (ATF) to the station. The new air treatment facility consists of a of a bio-trickling filter followed by an activated carbon filter which remove 90% of odours.

Scope of Service

  • Design and modelling of the Air Treatment Facility
  • Preliminary works (service locating, tree removal, construction of new access and vehicle cross over)
  • Installation of external duct from the existing well (source of the odour) to the new ATF building
  • Construction of the ATF building
  • Fabrication and Installation of Air Treatment Facility vessels
  • Bio-trickling and activated charcoal vessels lifted into the building and positioned
  • FRP ducting connected to the ATF
  • Access platform for the activated carbon vessels installed
  • Vent stack (outside the building) installed and connected to the FRP duct and extraction fans

Highlights:

  • Fully integrated service of design, fabrication and construction
  • Management of building permit process for MWC
  • Existing Sewer Pump Station kept operational at all times during construction
  • Management of community and stakeholder relations
Category
Construction